    Quote Originally Posted by mcfly View Post
    I would never suggest using the unfinished bridges, but I know that some riders have been using the new pedestrian bridges across 360 for weeks, to avoid the creek crossings from zilker to hol.
    how about the "unfinished bridges" over Walnut, that have been constructed for almost 2 years but still have orange construction fences up?
    Tex540 likes this.

  2. #22
    Live Medium Bamwa's Avatar
    Join Date
    Dec 2010
    Location
    Gnarnia
    Posts
    1,961
    Quote Originally Posted by TAF View Post
    Anyone know where it's going once it crosses Barton Creek over Mopac?
    Specs so you can "best buy" more beer then "feel good in the neighborhood" with a burger at Applebees?
    Grab life by the timbales.

    I live off the land... There's rosemary and guinea hen eggs and coastal oats in my neighborhood!

  3. #23
    Ayatollah of Rock and Rollah mack_turtle's Avatar
    Join Date
    Sep 2008
    Location
    ATX southside
    Posts
    1,437
    Quote Originally Posted by TAF View Post
    Anyone know where it's going once it crosses Barton Creek over Mopac?
    wait, are you talking north- or south-bound? going south, you can easily go through the Best Buy/Specs parking lot onto Brodie. some sidewalks might be involved, of course. I ride up and down Brodie all the time and it's a pretty easy route that seems safe. if you don't like the shoulder/ bike lane, which is sufficient, the sidewalk is fine so long as you're cautious around the driveways.

  4. #24
    MoJo Pope Hugh's Avatar
    Join Date
    Mar 2002
    Location
    Cedar Park
    Posts
    466
    I know this is late in response to the OP, but that article is really misleading. I think the contractor wanted to set up a crane on the existing bridge to lower beams to the new bridge.
    The article makes it sound like the new bridge was going to hang off of the existing bridge and engineering was not approved. I'm sure the "engineering" that needed to be approved was whether the cantilevered weight of beams on the end of a crane could be supported by the bridge.
    mack_turtle likes this.

  5. #25
    The guy with the tailgate grill
    MoJo SuppoRteR
    TAF's Avatar
    Join Date
    Dec 2007
    Location
    Midtown Austin
    Posts
    3,862
    Quote Originally Posted by mack_turtle View Post
    wait, are you talking north- or south-bound?
    Yes, I was thinking southbound - what it connects to, once it arrives at the turnaround.

    I'm actually interested in this bridge crossing for three reasons:

    1) It should allow for much longer and safer urban rides which connect parts north to points south and perhaps the South Walnut Creek paved trail, etc.
    2) It allows me to 'ride to the ride' - for example, riding from central Austin where I live, to a Big Southie Ride and back.
    3) Now and again, I can do a wussy crossing of Barton Creek on Green Belt rides, if it's cold and the crick's been a risin'.

  6. #26
    Ayatollah of Rock and Rollah mack_turtle's Avatar
    Join Date
    Sep 2008
    Location
    ATX southside
    Posts
    1,437
    once you get to Spec's, you go under Ben White and you are in Sunset Valley. take the gravel trails through the shopping center there and you are in the Cougar Creek GB. from there, you can get to all that Big Southie stuff - Williamson Creek, Stephenson, Dick Nichols, Slaughter, Circle C, etc without riding (virtually) any roads.
    Last edited by mack_turtle; 01-25-2016 at 01:38 PM.

  7. #27
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    609
    Yeah, it's gonna be nice. Saw those big beams and cranes in front of BB this morning. The BB/Sams/Specs parking lot can be busy at times, but I took my son through there a couple weeks back and it wasn't a problem. I think there will be an official hook up to the VCT to avoid that?

  8. #28
    The guy with the tailgate grill
    MoJo SuppoRteR
    TAF's Avatar
    Join Date
    Dec 2007
    Location
    Midtown Austin
    Posts
    3,862
    Looks like the current plan is for it to dead-end somewhere near Best Buy. Still, with that and the VCT - new ways to travel north-south and vice-versa.

    http://www.austintexas.gov/sites/def...roject_Map.jpg

  9. #29
    Supporting Member
    MoJo SuppoRteR
    The Tip's Avatar
    Join Date
    Mar 2013
    Location
    In the heart of the ............... SATN
    Posts
    1,429
    It's all good, regardless of how it connects. I have ridden over the Mopac bridge. I will go against traffic when I am northbound because there is a bit of shoulder there. But still, it is not fun. Anything will be better than having to ride Mopac.

    TAF, the map on your link shows it dead-ending across Mopac from Best Buy. Like I said before, they really don't have a plan on how to connect it other things in a simple way.

    And it will allow anyone to do a huge urban ride from Manor to south of Barton Creek with the only road being the two blocks of Shady Lane and the crossing of several drive ways along Mopac;s frontage road. Pretty cool stuff.
    Just call me The SATN Pimp

  10. #30
    The guy with the tailgate grill
    MoJo SuppoRteR
    TAF's Avatar
    Join Date
    Dec 2007
    Location
    Midtown Austin
    Posts
    3,862
    It also shows it dead-ending next to Best Buy, which is the happy happy ending I was referring to.

  11. #31
    Mojo Slow-poke Austin Bike's Avatar
    Join Date
    Apr 2002
    Location
    Seat 21B - exit row aisle
    Posts
    16,646
    Rode past it today and people were working on it, on a Saturday.
    "A person can work up a mean, mean thirst after a hard day of nothing much at all" - Paul Westerberg

    庄富瑞

    Click HERE for all your Austin Biking information


  12. #32
    MoJoMoRon bartman's Avatar
    Join Date
    Nov 2002
    Location
    oakhill
    Posts
    10,473
    all of the spans are up, it may get done in a few months

  13. #33
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    609
    Hopefully before they start the 360 lane changes.

  14. #34
    MoJo Priest latoaustin's Avatar
    Join Date
    Sep 2009
    Location
    austin, tx
    Posts
    34
    spoke with Tom McKinney friday morning. he is project supervisor. bridge is scheduled for completion in April.

    Sent from my SM-G900P using Tapatalk

  15. #35
    Supporting Member
    MoJo SuppoRteR
    The Tip's Avatar
    Join Date
    Mar 2013
    Location
    In the heart of the ............... SATN
    Posts
    1,429
    I noticed that they were putting street lights up along the path that has been cut into the hill north of 360. VERY fancy! And that bench cut is armored with fancy concrete walls too.
    As a biker I am sort of embarrassed by all this "fancy." Why do these things always have to be Cadillacs when a simple Yugo would get us there?
    Just call me The SATN Pimp

  16. #36
    MoJo Priest latoaustin's Avatar
    Join Date
    Sep 2009
    Location
    austin, tx
    Posts
    34
    you might get there, but you wouldn't get back. how many yugos do you see on the road?

    Sent from my SM-G900P using Tapatalk

  17. #37
    Supporting Member
    MoJo SuppoRteR
    The Tip's Avatar
    Join Date
    Mar 2013
    Location
    In the heart of the ............... SATN
    Posts
    1,429
    Quote Originally Posted by latoaustin View Post
    you might get there, but you wouldn't get back. how many yugos do you see on the road?

    Sent from my SM-G900P using Tapatalk
    lol

    I guess I look at projects like this and wish that the money spent on it would get spread around. Instead of 3 miles of "A+" trail, I would prefer 20 miles of "C" trail. I know it doesn't really work that way, I am super excited about this bridge, but that's how I think when I see resources being spent this way.
    Just call me The SATN Pimp

  18. #38
    MoJo Priest latoaustin's Avatar
    Join Date
    Sep 2009
    Location
    austin, tx
    Posts
    34
    agreed.

    Sent from my SM-G900P using Tapatalk

  19. #39
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    609
    +$XXM
    I guess this is what happens when TXDOT builds a bike path?
    IMO they could've cut in something smaller with a few bobcats and drop some prefab steel bridges on smaller footings and been done sooner. Maybe there's a secret plan to use it for emergency vehicles at rush hour?

  20. #40
    MoJo Mother Superior FJsnoozer's Avatar
    Join Date
    Jul 2015
    Location
    Austin
    Posts
    1,400
    I don't really think we should be complaining. Its nice, and I am going to use the hell out of it.

    FYI, construction crew present told a colleague of mine to go ahead and ride across on MTB.

    Now if only they would finish this 6 month, 2 block project that is the 3rd street bike lanes. Cyclists are already blowing the intersections almost taking out peds. Someone is going to get closed lined by a leash or get hit by a car which will be their fault.
    Last edited by FJsnoozer; 02-22-2016 at 11:23 AM.

Page 2 of 9 FirstFirst 123456 ... LastLast

Remove Ads

Search tags for this page (caching method: table)

austin barton creek bike and pedestrian

,

barton creek bike bridge

Click on a term to search our site for related topics.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •