  1. #61
    MoJo Priest codysoyland's Avatar
    Join Date
    Feb 2014
    Location
    Austin, TX
    Posts
    60
    The trails were dry enough this evening that I was able to ride down to the creek and see how the bridge looks. The end is still hanging 20 feet and the air and it looks like a lot of work is still left. :/ Name:  IMG_2443-small.jpg
Views: 550
Size:  593.9 KB
    FJsnoozer likes this.

  2. #62
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    614
    Yeah I was at the top end a week ago and it looks like they're spending alot of time building a long, wide switchback trail from the bike bridge up to street level before dropping in the final span and getting the bitch DONE. Boo.

  3. #63
    MoJoMoRon bartman's Avatar
    Join Date
    Nov 2002
    Location
    oakhill
    Posts
    10,557
    it looks like they have one more span pour on the south end..I havent looked on the north end to see if they've fin'd the pour

  4. #64
    Welcome to Costco, I love you. ninjammin's Avatar
    Join Date
    Mar 2010
    Location
    Here
    Posts
    602
    I peek at it a couple times a week on my way home and work seems to have screeched to a halt lately.

  5. #65
    MoJo Mother Superior FJsnoozer's Avatar
    Join Date
    Jul 2015
    Location
    Austin
    Posts
    1,677
    This is so awesome. Il have a quick route out to Travis country when the creek is knee high..

  6. #66
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    614
    Here's a crappy cameraphone picture from last week, standing at the top of a ~10 foot drop from the end of a construction road from the Gaines Ranch parking lot:
    Name:  BikeBridgeMay26.png
Views: 513
Size:  1.72 MB
    I work in one of the buildings you can see at the top of the hill on the left. It's gonna be mega

  7. #67
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    614
    Went by the same spot on the south end this morning and couldn't get close enough for a picture since it's an active work site. Seems like they're leaving that gap in the last bit of the bridge open while they do more work on the approach trail and retaining walls. They are also doing more work on the bridge itself... no longer just empty support beams and there's a bunch of equipment around. So progress, but not looking like it'll be done before ACL fest.

  8. #68
    MoJoMoRon bartman's Avatar
    Join Date
    Nov 2002
    Location
    oakhill
    Posts
    10,557
    crap..when are they going to finally pour that last section?!!!

  9. #69
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    614
    I bet they don't want people screwing around trying to use it as soon as the beams are in and if we're lucky they're going to drop in a prefab section that's all done at the last minute. But they sure are taking their sweetazz time getting to it. At this point I'm wishing it was a tolled bridge so they'd hurry up and finish.

  10. #70
    Supporting Member
    MoJo SuppoRteR
    The Tip's Avatar
    Join Date
    Mar 2013
    Location
    In the heart of the ................... SATN
    Posts
    1,605
    Quote Originally Posted by pmiranda View Post
    . At this point I'm wishing it was a tolled bridge so they'd hurry up and finish.
    Ha! Like that theory is working so well on the new Mopac toll lanes construction? (grrr)

  11. #71
    TAF
    TAF is online now
    The guy with the tailgate grill TAF's Avatar
    Join Date
    Dec 2007
    Location
    Midtown Austin
    Posts
    3,931
    Quote Originally Posted by bartman View Post
    crap..when are they going to finally pour that last section?!!!
    And finally, decades later, they find Jimmy Hoffa's body ....

  12. #72
    Supporting Member
    MoJo SuppoRteR
    cxagent's Avatar
    Join Date
    Jul 2008
    Location
    Oak Hill
    Posts
    1,699
    I was there yesterday. Work is progressing again. They are forming the landing for the south end of the bridge. It looks like they are getting close to placing the last bridge beams. It will take a while to finish the tread, railings, etc. But at least progress is happening again.
    bartman likes this.

  13. #73
    Supporting Member
    MoJo SuppoRteR
    The Tip's Avatar
    Join Date
    Mar 2013
    Location
    In the heart of the ................... SATN
    Posts
    1,605
    This guy is determined to be the first bike across the bridge.

    cramsay3 likes this.

  14. #74
    MoJo Mother Superior Tree magnet's Avatar
    Join Date
    Oct 2009
    Location
    Austin, TX
    Posts
    949
    You need to make three lefts to turn right on that bad boy.
    kerryp likes this.

  15. #75
    cmc
    cmc is offline
    MoJo Mother Superior cmc's Avatar
    Join Date
    Apr 2006
    Location
    austin
    Posts
    2,358



  16. #76
    I'm Rick James Bitch! kerryp's Avatar
    Join Date
    Jan 2012
    Location
    Bastrop
    Posts
    959
    We need one of those bus bridges in the greenbelt. Might not last very long, but hey...

    Sent from my LG-H900 using Tapatalk
    Last edited by kerryp; 09-12-2016 at 08:42 PM.

  17. #77
    MoJo Mother Superior Moonshine's Avatar
    Join Date
    Mar 2013
    Location
    Four Squares
    Posts
    726
    Mopac is scheduled to be closed 9/25 from 10pm-5am.
    I am assuming to set the last beams.

  18. #78
    MoJo Mother Superior Moonshine's Avatar
    Join Date
    Mar 2013
    Location
    Four Squares
    Posts
    726
    Or it could be for the stupid ass traffic creating curve at the Enfield exit. I hope it is is for this because Austin drivers are retarded and do not know how to maintain speed around curves, or merge lanes, or rain.

  19. #79
    MoJo Mother Superior pmiranda's Avatar
    Join Date
    Feb 2009
    Location
    Austin, TX
    Posts
    614
    Yeah, for some reason most people can manage to change lanes at 60 MPH, but if the road shifts by the same amount, they slow to 30.... "ADVISORY SPEED 50 MPH" people... get with the program! I saw a subie blast through there early on a Saturday morning at about 90 last month... warmed my heart

    But anyway.. I hope the closure is for setting the last bridge segment.

  20. #80
    Ayatollah of Rock and Rollah mack_turtle's Avatar
    Join Date
    Sep 2008
    Location
    ATX southside
    Posts
    1,635
    The speed limit on the north end of MOPAC is clearly marked 55 mph in the construction zone, but everyone seems to do 35 or 85.

Page 4 of 10 FirstFirst 12345678 ... LastLast

Remove Ads

Search tags for this page (caching method: table)

austin barton creek bike and pedestrian
,

barton creek bike bridge

,
mopac pedestrian bridge
Click on a term to search our site for related topics.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •